Moving, felling trees on Tran Hung Dao street for construction of S12 station, urban railway line 3, section Nhon - Hanoi Station

By:

The Hanoi Urban Railway Management Board has been licensed by the Department of Construction to move and cut 40 trees, of which 35 trees were moved, and 05 trees were cut down due to aging and decay within the scope of construction of S12 station. .

The 35 trees are moved, including: Board: 06 trees; Bang: 02 trees; By the tomb: 03 trees; Milk flower: 03 plants; Muzzle: 03 plants; Pale: 04 trees; Phoenix: 02 trees; Crocodile: 04 trees; Si: 03 trees; Milk: 02 trees; Cooling: 01 tree; Nacre: 02 trees. Plant growth and development are normal, with trunk diameter (D 1.3) from 11.5 to 130.5 cm, height soaring (Hvn) from 3.0 to 14.0 m.

05 trees for felling include: Milk flower: 02 trees; Muoi: 01 tree; Phoenix: 02 trees. Current status of stumped, old and decaying trees with stem diameter from 20.8 - 74.8cm, height from 3.0 to 14.0m.

02 Red Safflower trees were moved to Thong Nhat Park to care, manage and preserve.

Moved and handed over 06 trees to Hanoi Green Park Company Limited to care for and plant on other streets according to regulations.

Moved the remaining 27 trees to permanently plant in a plot of land at the intersection of Vinh Ngoc - Dong Anh.

6be998f4 486c 4acc ade4 70e0239b18bf?t=1607568326231
e0429ed8 f997 4cc1 bcfc 0c3ed3f387c4?t=1607568346740
5d605b6a d8bf 4912 8f0c 2c271f164b60?t=1607568366522
7e1fbe64 85d9 4eb6 b34d f1b2566f801e?t=1607568388250

                                                                    TT-MRB

Source: Hanoi Urban Railway Management Board-https://mrb.hanoi.gov.vn/tin-tuc/-/view_content/3933178-dich-chuyen-chat-ha-cay-xanh-tren-he- pho-tran-hung-dao-de-thi-cong-ga-s12-tuyen-duong-sat-do-thi-so-3-doan-nhon-ga-ha-noi.html

Leave a Reply