The Hanoi Urban Railway Management Board has been licensed by the Department of Construction to move and cut 40 trees, of which 35 trees were moved, and 05 trees were cut down due to aging and decay within the scope of construction of S12 station. .
The 35 trees are moved, including: Board: 06 trees; Bang: 02 trees; By the tomb: 03 trees; Milk flower: 03 plants; Muzzle: 03 plants; Pale: 04 trees; Phoenix: 02 trees; Crocodile: 04 trees; Si: 03 trees; Milk: 02 trees; Cooling: 01 tree; Nacre: 02 trees. Plant growth and development are normal, with trunk diameter (D 1.3) from 11.5 to 130.5 cm, height soaring (Hvn) from 3.0 to 14.0 m.
05 trees for felling include: Milk flower: 02 trees; Muoi: 01 tree; Phoenix: 02 trees. Current status of stumped, old and decaying trees with stem diameter from 20.8 - 74.8cm, height from 3.0 to 14.0m.
02 Red Safflower trees were moved to Thong Nhat Park to care, manage and preserve.
Moved and handed over 06 trees to Hanoi Green Park Company Limited to care for and plant on other streets according to regulations.
Moved the remaining 27 trees to permanently plant in a plot of land at the intersection of Vinh Ngoc - Dong Anh.




TT-MRB
Source: Hanoi Urban Railway Management Board-https://mrb.hanoi.gov.vn/tin-tuc/-/view_content/3933178-dich-chuyen-chat-ha-cay-xanh-tren-he- pho-tran-hung-dao-de-thi-cong-ga-s12-tuyen-duong-sat-do-thi-so-3-doan-nhon-ga-ha-noi.html